Field Section 02
Response Planning
Site layout, clean/dirty flow, runoff, documentation and the logistics that turn a bath station into a real response system.
01
Response Planning
02Building a Companion-Animal Decon Station: Flow Before Equipment
A planning-oriented guide to decon station layout, one-way animal flow, triage, wash areas, runoff control and clean release during emergencies.
Response Planning
03Preventing Cross-Contamination Around Animals: The Part Decon Plans Miss
How leashes, crates, handlers, towels, vehicles and animal shaking can move contaminants out of a decon area—and how planning reduces that risk.
Response Planning
After the Wash: Post-Decon Monitoring, Documentation and Release
What happens after animal decontamination, from clean-side assessment and re-monitoring to documentation, reunification and veterinary follow-up.